
Shower remodel
Old shower or tub out, new pan built, walls waterproofed, tile up, ready for glass.
- Tub-to-shower conversions
- Walk-in and curbless showers
- Sloped pan, flood tested
Shower remodels, tub-to-shower conversions and full bathroom tile across Brevard County. Demo to grout by the owner. A few days for a standard bath.
Most quotes go out the same day. No obligation.
Tile is the last step. The three that come before it are the ones that matter.
Grout is not waterproof. If the walls and pan are not sealed underneath, water gets to the studs and you find out a year later. We waterproof the whole wet area before a single tile goes up.
A flat or backward-sloped shower pan holds water and grows mold. We build the slope to the drain, flood test it, and only then tile.
Demo, hauling, tile, grout, caulk. Piecing it out across three people is how bathrooms stay torn up for months. One crew, start to finish.
Full remodel or just the shower. You pick the tile, or we help you pick it.

Old shower or tub out, new pan built, walls waterproofed, tile up, ready for glass.

The details that make a shower usable. Built in, waterproofed, tiled to match.

Floor tile, wainscot, accent walls. Set flat with the layout planned from the door.
Every one started with a sledgehammer. This is what they look like when we hand it back.
BeforeAfter
BeforeAfter









Our own jobs. Every photo on this page is a floor or bathroom we installed in Brevard County. Drag the line on the before-and-after to compare.
Send photos of the bathroom and your ZIP. You get a range by text, usually the same day, priced for the room, not a flat rate.
From your photo to the last bead of caulk.
Shower, floor and vanity area from the doorway. A photo of your tile if you have it.
Size, what's coming out and niches or benches set the range. Usually same day.
We check the drain, walls and floor, confirm the layout, lock the number and start date.
Tear-out and haul-away, waterproofing, pan, tile, grout, caulk. A few days for a standard bath.
Outside this list? Send your ZIP anyway. Depending on the size of the job, we may still make the drive.

What people ask before they text us about a remodel.
A standard bathroom is a few days from demo to finished grout. Large-format tile, a bench, double niches or a full floor and wall job add time. You get the timeline at the walkthrough, before we start.
Yes. Tub out, new sloped pan built and flood tested, walls waterproofed, tile up, curb or curbless. Tell us whether you want a curb and we plan the pan around it.
Waterproof first, always. Grout and tile let water through. We seal the pan and walls with a membrane system, flood test the pan, and only then tile. It's the part nobody sees and the part that decides whether the shower lasts.
Yes. Most of our bathrooms are labor-only. You pick the tile, we handle demo, hauling, waterproofing, pan, setting, grout and caulk. If you'd rather we supply everything, we do that too.
Not the shower, no. The toilet and sink usually come out for a day or two if the floor is being tiled. We tell you the exact days at the walkthrough so you can plan around it, and we leave the site swept every evening.
Text it with your ZIP. You get a remodel price range back, usually the same day.